Metro Red Line South Elevated

Doha Metro Red Line South Elevated & at Grade

Company:

FCC Construcción. Committee: FYAP. Metro RLSEAG

Project Date:

March 2014

Project summary:

Total length of the section 8km.
6 kilometres raised structure
3 symbolic underground stations
1 underpass comprising two twin tunnels with a highway section (Ashghal Highway Underpass)

BIM level of development: LOD 300 both for the project design and the design for electricity, plumbing and mechanical equipment. LOD 300 and LOD 400 for architectural finishing touches to stations.

Client: QATAR RAIL

Purpose of using BIM:

The work executed is a design and build following the FIDIC yellow book adapted by the client. The entire project design was carried out using BIM, with design plans directly taken from the model. This enabled measurements to be controlled from the BIM. BIM was also linked to the work programme (Primavera), enabling the construction process to be planned and verified.

Success achieved:

In this case the use of BIM is a condition directly imposed by the contracting client.

Avatar

About bim

BIM (Building Information Modeling) es una metodología de trabajo colaborativa para la gestión de proyectos de edificación u obra civil a través de una maqueta digital. Esta maqueta digital conforma una gran base de datos que permite gestionar los elementos que forman parte de la infraestructura durante todo el ciclo de vida de la misma.